• Pre-stressed pipe pile foundation is used in the gymnasium of certain primary school, in which some pile-heads of them are deviated during the course of constructing.

    通过对某小学活动馆的预应力管桩基础在施工过程中出现的桩头偏位的情况进行分析与处理,取得了较好的实用效果并得到了一些有益的经验。

    youdao

  • But pipe pile foundation has also its limitation and disadvantage. The paper states the suitable condition and characteristics of design and construction of prestressed pipe pile.

    文中综合论述预应力管桩基础的适用条件及设计与施工特点。

    youdao

  • Through the computation of ultimate vertical bearing capacity of a single pile and design pile layout and so on, summarized experience of designation about prestressed concrete pipe pile foundation.

    介绍了一个应用预应力高强混凝土管桩的工程实例,通过单桩竖向极限承载力计算和布桩设计等多方面的设计过程,总结了在预应力高强混凝土管桩设计中的心得体会。

    youdao

  • Through the computation of ultimate vertical bearing capacity of a single pile and design pile layout and so on, summarized experience of designation about prestressed concrete pipe pile foundation.

    介绍了一个应用预应力高强混凝土管桩的工程实例,通过单桩竖向极限承载力计算和布桩设计等多方面的设计过程,总结了在预应力高强混凝土管桩设计中的心得体会。