The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
Be involved in pre-commissioning test of rotating equipment.
参加转动设备的预调试测试。
In view of this, technical transformation was made on the weak links in the original process found in the pre-commissioning.
为此,根据前期调试中发现的问题,对原流程中的薄弱环节进行了技术改造。
In view of this, technical transformation was made on the weak links in the original process found in the pre-commissioning.
为此,根据前期调试中发现的问题,对原流程中的薄弱环节进行了技术改造。
应用推荐