The model of internal force for the secondary lining and the laws of the deformation and the stability for the surrounding rock have been set up firstly in the double-arch tunnel.
首次建立了双连拱隧道二次衬砌内力(轴力和弯矩)模型及围岩的稳定与变形的规律。
The model of internal force for the secondary lining and the laws of the deformation and the stability for the surrounding rock have been set up firstly in the double-arch tunnel.
首次建立了双连拱隧道二次衬砌内力(轴力和弯矩)模型及围岩的稳定与变形的规律。
应用推荐