The operation, should avoid high voltage line and elevated grid, to ensure the pile machine drill stand erect not be affected.
作业时,应避开高压线路及高架电网,以保证按桩机钻架的架设不受影响。
The operation, should avoid high voltage line and elevated grid, to ensure the pile machine drill stand erect not be affected.
作业时,应避开高压线路及高架电网,以保证按桩机钻架的架设不受影响。
应用推荐