Secondly, the paper discusses the main functions of the temporary road system, advances the feasibility and necessity of optimum design.
其次论述临时路面系统的主要功能,提出优化设计的可行性和必要性。
He also describes how to reduce the ore quantity under the road in the development of permanent road and temporary road, how to decrease the mining loss of Pingguo Bauxite...
并对如何减少开拓固定公路和临时公路压矿、减少平果铝土矿的采矿损失率、充分利用国家矿产资源等问题,进行了论述。
Presently, the complete loading calculation mode is widely used as the design method of the metro station, but the vertical load from the temporary road surface system isn't taken into account.
目前,我国地铁车站设计中普遍采用的一次加载的计算模式,也没有考虑盖挖施工临时路面体系传递的竖向荷载。
Presently, the complete loading calculation mode is widely used as the design method of the metro station, but the vertical load from the temporary road surface system isn't taken into account.
目前,我国地铁车站设计中普遍采用的一次加载的计算模式,也没有考虑盖挖施工临时路面体系传递的竖向荷载。
应用推荐