• This is the story of the Three Gorges project-china's Mega Dam.

    这是中国三峡大坝工程的故事。

    youdao

  • The main river closure is one of key techniques for the Three Gorges Project.

    长江三峡工程大江截流是三峡工程的关键技术之一。

    youdao

  • Ship lock was one of the main engineering projects of the Three Gorges project.

    三峡船闸是三峡工程的主要工程之一。

    youdao

  • With the impounding of Three Gorges Project, study on this problem became urgent.

    随着三峡工程完工蓄水,这方面的研究显得愈加迫切。

    youdao

  • The disposition of generator-transformer set for Three Gorges project is briefed.

    介绍了三峡电站发电机组配置的基本概况。

    youdao

  • In this paper the treatment of domestic refuse of Three Gorges project was studied.

    本文对三峡工程生活垃圾的处理进行了研究。

    youdao

  • Through studies for almost half century, the Three Gorges Project has started to build.

    三峡工程经过近半个世纪的研究,现在已经正式开工兴建。

    youdao

  • Taijitou landslide is a large scale and deeply buried landslide in Three Gorges Project.

    太矶头滑坡是三峡工程库区一大型深层滑坡。

    youdao

  • The Three Gorges Project used the distributed optical fiber temperature measurement system.

    三峡工程采用了光纤分布式测温系统。

    youdao

  • The main function and usage of the system are introduced with practice in the Three Gorges project.

    结合三峡库区的一些工程实例介绍了系统的具体功能和使用方法。

    youdao

  • The Three Gorges Project has all-around benefit including generating electricity, flood control and shipping.

    长江三峡工程,具有发电、防洪、航运等综合效益。

    youdao

  • This paper describes the characteristics, method analysis and new ways for cost management of Three Gorges project.

    本文阐述了三峡工程造价管理的特点、造价管理方法分析和造价管理的新途径。

    youdao

  • The turbine for the Three Gorges Project is one of the mixed-flow turbines with great changes of operation water head.

    三峡电站水轮机是运行水头变幅最大的混流式水轮机之一,其外形尺寸和重量亦是当前混流式水轮机之最。

    youdao

  • As the time of completion of the Three Gorges Project is drawing near, to have the issue studied is becoming more urgent.

    随着三峡工程计划竣工日期的日渐临近,这方面的研究显得愈加迫切。

    youdao

  • Through the slope displacement forecasting of the Three Gorges Project list slope and Xintan slide, the results are satisfied.

    通过对三峡升船机高边坡和新滩滑坡实际位移数据进行预测,研究了它们的混沌特征,结果令人满意。

    youdao

  • CTGU has made outstanding contributions to the construction of the Three Gorges Project and the development of Qingjiang River.

    学校在三峡工程、清江流域开发工程等建设中做出了突出贡献。

    youdao

  • Yichang is becoming more and more widely known for the huge Three Gorges Project and the policy of opening to the outside world.

    随着三峡工程动工兴建,宜昌在国内外声誉日益提高。

    youdao

  • The one-way, single-step vertical shiplift with counterweight is one of the most important structures in the Three Gorges project.

    单级全平衡重垂直升船机是三峡工程的最重要的组成部分之一。

    youdao

  • The Three Gorges project is one huge project, which has multipurpose such as flood control, electricity generation, shipping, etc.

    三峡水利枢纽是一座具有防洪、发电、航运等综合利用的巨型工程,其综合效益巨大。

    youdao

  • The stainless composite steel plate is used in the metallic structure in Three Gorges Project, which is initial in hydraulic power station.

    三峡工程的金属结构中使用了大量的不锈复合钢板,这在国内水电建设中尚属首次。

    youdao

  • Three Gorges project; fault crushed zone; pelization band; grouting material; chemical grouting; compound grouting; construction technology.

    长江三峡工程;断层破碎带; 泥化夹层;灌浆材料;化学灌浆;复合灌浆;施工技术;

    youdao

  • Based on the Three Gorges Project, it presents the mixture ratio design, construction technology, and quality control of the steel fibre concrete.

    结合三峡工程实例,论述了钢纤维混凝土的配合比设计、施工工艺、质量控制。

    youdao

  • D deeply embedded inverted plumb and deformation monitoring system has been studied for achieving required accuracy in monitoring Three Gorges project.

    为满足三峡工程变形监测的精度要求,对深埋三维倒垂和变形监测基准系统进行研究。

    youdao

  • The downstream navigation channel of the Three Gorges Project is excavated on dry land, which requires that the partition dikes should prevent leakage.

    三峡水利枢纽下游引航道的开挖在干地条件下进行施工,要求隔流堤具有防渗功能。

    youdao

  • The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.

    三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。

    youdao

  • The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.

    三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定