The deflection and the crack width of the SRC transfer girder are calculated.
验算钢骨混凝土转换梁的挠度和裂缝宽度。
The steel framed reinforced concrete column partially penetrates into the transfer girder, whose build-in effect to the column enhances with the increase of the penetrating length.
钢骨柱部分伸进转换梁中,随着钢骨伸进转换梁中长度的增加,转换梁对钢骨的包裹嵌固作用增强。
Transfer girder co-works with the structures above and below.
转换梁和上、下部结构有明显的共同工作特性。
Transfer girder co-works with the structures above and below.
转换梁和上、下部结构有明显的共同工作特性。
应用推荐