• The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.

    针对国内外规范对导叶开启时间的不同规定,结合理论推导和数值计算实例,分析了不同的导叶开启时间对水电站过渡过程的影响。

    youdao

  • The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.

    针对国内外规范对导叶开启时间的不同规定,结合理论推导和数值计算实例,分析了不同的导叶开启时间对水电站过渡过程的影响。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定