• After you set TRACKMOD to YES, you must back up the database before allowing applications to change data.

    在将TRACKMOD设置为YES之后,您必须在允许应用程序更改数据之前备份数据库。

    youdao

  • At the same time they have set up back-up data centres in other locations that can take over the activities at any time if a major disaster occurs.

    同时,它们还在其它地点建立了后备数据中心,可以随时在重大空难发生时采取行动。

    youdao

  • Based on the measured ground stress data, a 3d non-linear finite element back analysis numerical model for ground stress is set up and the fault and fissure concentrated zone is simulated.

    结合实测地应力资料,建立了三维非线性有限元地应力反演分析数值模型,模拟了断层及裂隙密集带。

    youdao

  • Based on the measured ground stress data, a 3d non-linear finite element back analysis numerical model for ground stress is set up and the fault and fissure concentrated zone is simulated.

    结合实测地应力资料,建立了三维非线性有限元地应力反演分析数值模型,模拟了断层及裂隙密集带。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定