We couldn't agree on the budget estimate.
我们不能在预算问题上取得一致。
Through improving the process, we enhance the quality and efficiency of the budget estimate making.
通过流程改进,以提高概算编制的质量和效率。
For the owner, a budget estimate must be adopted early enough for planning long term financing of the facility.
对业主来说,必须尽早明确预算(budget estimate)用于项目的长期财务规划。
There are 3 types of estimates according to the accuracy of estimate: order-of-magnitude estimate, budget estimate and definitive estimate.
按照估算的精确度范围可以将估算分为3大类,量级估算、预算估算和确定性估算。
Design budget estimate making software for railway capital construction projects, is an important method to improve the quality of budget estimate.
铁路基本建设工程的设计概算编制软件,是提高设计概算编制质量的重要手段。
For the contractor, the bid estimate is usually regarded as the budget estimate, which will be used for control purposes as well as for planning construction financing.
对承包商来说,经常用投标估价作为预算,既可以进行成本控制,也可以进行施工期间的财务规划。
Although our survey results are a qualitative assess-ment rather than a budget estimate, they nevertheless demonstrate a remarkable vote of confidence in the cloud by adopters.
尽管我们的调查结果是一个定性的评估而不是经费预算,但它仍然说明了采纳者对云的信心。
Consequently, the detailed estimate is often used as the budget estimate since it is sufficient definitive to reflect the project scope and is available long before the engineer's estimate.
因而,在工程师估算完成前的相当长时间里,只能用详细估算来作为控制预算,因为详细估算也能充分明确地反映项目的范围。
Pipeline design system based on GIS is based on data of GIS to locate the center line of pipeline in plane and portrait, and extract pipeline data to make automatically project budget estimate.
基于GIS的油气管线设计系统是以GIS数据为基础,确定管道设计中线的位置,包括平面位置和纵向埋深;并提取管线数据自动进行工程土方量、占地面积、工程拆迁等方面的工程概预算。
These would identify the work accomplished on the task and the budget expended on it since the last report, and would estimate the effort remaining on the task.
这些报告能够指出最近一周的任务工作完成情况和在任务中的预算的花费情况,并且可以估计任务中剩余的工作量。
The projected size of the two-year shortfall has been creeping up, from $11 billion to $15 billion; $18 billion is last month’s estimate from the state’s Legislative Budget Board.
预估的今明两年财政缺口正在不断扩大,从110亿美元攀升至150亿美元;而根据州预算立法委员会上月的估算,这一数字将变为180亿美元。
Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.
在实际操作当中,无论详细的成本估算中是否包括了意外事件,项目预算都应列支一笔应急储备金。
The paper introduces the automatical realization method of rate setting and rate association through the study of logical relationship between budgetary estimate and budget sheets.
论文对通信建设工程概预算表间逻辑关系进行了研究,介绍了费率自动设置和表间自动关联的实现方法;
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
In the software project management's cost management mainly displays in aspects and so on project estimate, budget and control.
软件项目管理中的成本管理主要表现在项目的估算、预算和控制等方面。
We can edit , print and save engineering budget and budgetary estimate , and maintain various construction project quota by this system.
我们使用该系统能方便完成工程概预算文件的编制、打印与归档保存,以及各类建筑定额的维护操作。
In view of over estimate budget in engineering cost, the author thinks that design is the key, and quota design is the best way of control engineering cost.
针对工程造价超概算问题,本人认为设计是关键,通过限额设计可以控制工程造价。
This paper have resolved the contradiction between market price and (budgetary estimate and budget), and also resolved the contradiction between standard bidding price and profit.
要解决既要中标、又要获利,市场价格与概预算定额的矛盾,就要从自身能力、施工技术装备费用、预期利润等多方面入手。
And carries on the cost estimate, the budget and the control to the morning star company's ERP project.
并对晨星公司的ERP项目进行成本估算、预算及控制。
Through logical estimate, budget, control and communication of expenditure, the thesis strives to draft finance management system suitable to the institution.
通过对费用合理的估算、预算、控制、沟通,力求制定出适合本单位的项目财务管理体系。
During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.
在初步设计、施工图设计阶段分别编制初步设计概算书和施工图设计预算书,进一步优化成本预算。
The estimated or forecast total cost in each category is the current best estimate of costs based on progress and any changes since the budget was formed.
每一项次的预计总成本是根据预算构成后项目的实际进展和变更对当前成本的最为精确的估算。
This not only needs the informative collection ability and the estimate abilities, but also needs the budget.
这不仅需要信息搜集能力和评估能力,还需要预算。
Have three-year college degree (or equivalent education level), at least 3 years experience in cost estimate and budget as well as experience in construction site.
具有大专以上学历(或同等级别的教育经历),在工程造价专业方面有3年以上工作经验以及工程现场的预结算工作经历。
The revision reflects an estimate for average world oil prices of $40 per barrel, down from the $50 per barrel previously used to calculate the budget, Bakhyt Sultanov told lawmakers.
修订反映了概算为世界平均油价每桶40美元,低于每桶50美元以前用来计算预算,Bakhyt苏丹诺夫告诉国会议员。
The revision reflects an estimate for average world oil prices of $40 per barrel, down from the $50 per barrel previously used to calculate the budget, Bakhyt Sultanov told lawmakers.
修订反映了概算为世界平均油价每桶40美元,低于每桶50美元以前用来计算预算,Bakhyt苏丹诺夫告诉国会议员。