Only in 2014 will nuclear authorities be filing an application to build a storage facility near the Bure underground laboratory in eastern France.
到2014年,法国核机构才会提出申请,以在法国东部布雷地下实验室附近建造一个储存设施。
The paper discussed the strength calculation of the growing circle bure of small scale vertical boiler, and put forward his opinion according its stress.
就小型立式锅炉长圆孔开孔强度计算进行了探讨,根据长圆孔的应力状态,提出了自己的看法。
The paper discussed the strength calculation of the growing circle bure of small scale vertical boiler, and put forward his opinion according its stress.
就小型立式锅炉长圆孔开孔强度计算进行了探讨,根据长圆孔的应力状态,提出了自己的看法。
应用推荐