• The cushion layer for the dam is constructed with the material prepared mainly with natural sandy gravel and mixed with proper amount of pebble and coarse sand.

    大坝采用天然砂砾为主、掺入小砂以调整级配方式生产。

    youdao

  • Both saturated-unsaturated flow drainage experiment without the fine sand layer on the top of the coarse sand and air-water two-phase flow drainage experiment with the fine sand layer were performed.

    进行上部没有细砂质砂柱饱和-非饱和排水实验以及粗砂上部存在细砂层的水气二相流排水实验。

    youdao

  • The foundation of the dam for Dalong reservoir consists of the layer of medium-coarse sand with gravel, so it is difficult to be penetrated even by the high-power vibrator.

    水库大坝坝基含卵砾中粗即使大功率振冲器难以贯入

    youdao

  • The foundation of the dam for Dalong reservoir consists of the layer of medium-coarse sand with gravel, so it is difficult to be penetrated even by the high-power vibrator.

    水库大坝坝基含卵砾中粗即使大功率振冲器难以贯入

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定