Company covers an area of 5300 square meters, construction area of 3000 square meters.
公司占地面积5300平方米,建筑面积3000余平方米。
Catalpa peak building, a total construction area of 10589 square meters, built in time in 1976.
梓峰大厦写字楼总建筑面积10589平米,建成时间1976年。
One tablet workshop 2180 square meters construction area, storage area of 1000 square meters Center.
其中片剂车间建筑面积2180平方米,仓储中心建筑面积1000平方米。
According to the specific road construction area, the use of new barriers to the actual installation.
根据具体公路施工面积,选用新的护栏进行实际安装。
Kindergarten construction area of nearly 20000 square, is currently the largest kindergarten in Henan.
幼儿园建筑面积近2万平方,是目前河南最大的幼儿园。
Hisense Plaza is the top luxury brand Hisense group. The total construction area of 62800 square meters.
海信广场是海信集团所属的顶级奢侈品名店。总建筑面积6.28万平方米。
The construction area of the Guangzhou Asian Games City is around 358,000 square meters. How much is the coverage area?
广州亚运城建筑面积约是35.8 万平方米,占地面积为多大?
Three school buildings, construction area of 8587M2, there are 65 classrooms with a projector and a tape recorder.
教学楼三座,建筑面积8587M2,有教室65个,并配有录音机和投影仪。
Tangshan Antique Continental is a three-back-shaped building, with a total construction area of 6000 square meters.
唐山古玩城是一座回字形欧式三层建筑,总建筑面积6000平方米。
According to the specific highway construction area, the use of a new waveform guardrail board for actual installation.
根据具体公路施工面积,选用新的波形护栏板进行实际安装。
The transient electromagnetic method has a stronger adaptability to the surface of construction area, with a higher effectivity.
瞬变电磁法对于施工区地表有较强的适应能力,工作效率较高。
The new find came as workers began digging up the east side of the construction area, which once housed the World Trade Center complex.
这个新发现源于工人在挖掘这个建筑地区的东侧时,而这里曾经建有世纪贸易中心的建筑群。
The railway station, with construction area of 98,300 square meters, was put into operation on Monday after four years' construction.
火车站占地面积98,300平方米,进过四年的建设与上个星期一投入使用。
This kind of project has some characteristics such as various construction contents, big construction area and long construction period.
这类项目具有建设内容丰富、建设范围大、建设周期长等特点。
Since then I have always taken care 'to look at the site' and do a drawing before calculating the square meters of the construction area.
从那以后,我总是小心翼翼地关注场地并且在计算建造区域的面积之前画一张草图。
Hotel total construction area of 26000 square meters, is located in the yellow sea, pleasant climate, beautiful scenery, is a coastal park landmark.
酒店总建筑面积约2.6万平方米,地处黄海之滨,气候宜人,风景优美,是滨海园区内的地标性建筑。
The company's existing production and R & D center construction area of 100,000 square meters, equipped with advanced detection equipment more than 30 sets.
公司现有生产和研发中心建筑面积达10万平方米,配备先进检测仪器设备30余台套。
The construction area of the extension project of Wujiangdu Hydropower Station has complex geologic conditions, developed karst with strong seepage conditions.
乌江渡水电站扩机工程施工区地质条件复杂,岩溶发育,存在渗漏条件。
Located in the north of Shanghai and with a construction area of 101 mu, Hongbei industry Park is a newly constructed industry zone with hi-tech as its mainstay.
虹北工业区是以高科技为主的新兴工业区,它位于上海的北部,占地面积101亩。
The second stage construction area on the main river bed is formed by the second stage up & downstream transverse cofferdams and the longitudinal con crete cofferdam.
三峡工程二期上、下游横向围堰与混凝上纵向围堰共同形成二期基坑,测绘工作要求很高。
The paper introduces the BOT, a new way in construction of infrastructures, which is popular around the world, this will profit to the construction area in our country.
此文介绍了世界较为通用的基础设施新的建设方式BOT,为我国基础设施建设领域引入了新的活力。
Brief introduction on strata in construction area and reviewed drilling technology and well completion technique, and meanwhile explained pumping test and water quality.
简介了施工区地层,论述了钻井技术要点和成井工艺;说明了抽水试验及水质概况。
The planned construction area is approximately 375mu, including 315mu industrial land, 35mu commercial and residential land, and about 25m land for cross-border water system.
规划建设用地面积约375亩,其中工业用地约315亩,商业住宅用地约35亩,过境水系用地约25亩。
Part II looked at technology changes that affect the design and construction area and discussed the categories of tools best-suited for different types of development projects.
第二部分关注于影响设计和构建的技术变迁和讨论了对于不同类型的开发项目最适合的开发工具的种类。
Part II looked at technology changes that affect the design and construction area and discussed the categories of tools best suited for different types of development projects.
第二部分介绍了影响设计和构建领域的技术变化,并讨论了适合不同类型开发项目的工具。
So construction area calculating methods could not exchange, which should be paid attention especially of the project estimation, between construction and real estate industry.
因此,在建筑行业和房地产行业的各自建筑面积不能相互套用,不同时期的建筑面积不能相互代替使用,特别是在工程估价中应深究慎用。
So construction area calculating methods could not exchange, which should be paid attention especially of the project estimation, between construction and real estate industry.
因此,在建筑行业和房地产行业的各自建筑面积不能相互套用,不同时期的建筑面积不能相互代替使用,特别是在工程估价中应深究慎用。
应用推荐