When construction began in 1969, Metsamor was a VVER 440, Model 230, an example of one of the earliest pressurized-water nuclear plant designs, developed by the Soviets between 1956 and 1970.
当1969年开始建设时,Metsamor用的是VVER440型230反应堆,最早的压水堆核电站的设计样板之一,是由苏联在1956年- 1970年间开发的。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
Hydropower Station plant is an important part of the building, due to design or construction of negligence resulting in leakage of water, which impact the use of hydropower plant function and life.
水电站厂房是水电站建筑物的重要组成部分,因设计或施工方面的疏忽而造成渗漏水,影响水电站厂房的使用功能和使用寿命。
Construction of the steel plant, steel, color steel, glazed tile roofs and steel plants and other water corrosion preventive effect.
工厂建筑中的钢管、钢板、彩钢板、琉璃瓦屋顶和钢结构厂房的防水防腐防锈等作用。
If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant.
电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。
The treated wastewater of Fenjiu alcohol plant is reused in alcohol cooling, toilet washing, vine irrigating, construction water consumption and lawn watering etc.
汾酒厂中水回用于酒班冷却、住宅楼及厂区冲厕、葡萄园浇地、基建用水、厂区绿化等用途。
There are daily water supply 25 thousand tons of water plant with a daily water supply capacity of 5 million tons of new water plant is under construction.
目前有日供水2.5万吨的自来水厂一座,日供水量5万吨的新自来水厂正在筹建中。
Shequshi urban and suburban construction of the existing sewage treatment plant to the recycling of sewage facilities, and encourage renewable water for municipal, environmental, green water ;
设区市城区和近郊的现有污水处理厂必须建设污水再生利用设施,鼓励再生水用于市政、环卫、绿化用水;
Main technical measures are as follow: in construction of ecology, implementing rational disposition of engineering measures and plant measures to control soil and water loss;
其主要措施是:在生态建设方面实施工程措施和植物措施对位配置,控制水土流失;
The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."
通过对拟建中的西安市第四污水处理厂初沉池入流污染物的沉淀试验,得到不同水深和沉淀时间下的ss去除率曲线。
The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."
通过对拟建中的西安市第四污水处理厂初沉池入流污染物的沉淀试验,得到不同水深和沉淀时间下的ss去除率曲线。
应用推荐