• In December of 1869, Congress appointed a commission to select a site and prepare plans and cost estimates for a new State Department Building.

    1869年12月国会任命了一个委员会新的国务院大楼选择地点制订计划估算成本

    youdao

  • May prepare cost estimates for customers or clients.

    可以顾客客户准备成本估算

    youdao

  • Two methods to treat the interval cost estimates have been proposed.

    文章提出两种处理区间数的方法

    youdao

  • The optimizer bases query cost estimates on the number of rows to be retrieved from each table.

    优化将根据每个中检索行数评估查询成本

    youdao

  • The query optimizer bases query-cost estimates on the number of rows to be retrieved from each table.

    查询优化根据每个检索估计查询成本。

    youdao

  • Cost estimates are binding and are not to be compensated unless otherwise expressly agreed by us.

    除非我方明确同意,预计成本具有约束力,且无须予以补偿。

    youdao

  • CMM required that project effort and cost estimates be developed according to a documented procedure.

    CMM要求项目努力开销评估根据一个记录程序进行。

    youdao

  • These meetings should include reviewing and updating the construction schedule and the cost estimates.

    这些会议应当包括回顾更新施工进度成本预算

    youdao

  • Cost estimates are generally disaggregated into appropriate functional or resource based project categories.

    成本估算通常分解基于项目范畴的功能资源上。

    youdao

  • For example, a great deal of effort is put into producing valid and reliable data for software project cost estimates.

    例如大量工作用来为软件项目成本估算产生有效可靠数据

    youdao

  • These allowances are included in project cost estimates to accommodate unforeseen events and the resulting costs.

    为了应付不可预见事件由此产生的成本,通常项目成本估算中要安排一定数量的储备金

    youdao

  • For materials in collective requirements, the existing cost estimates are transferred into the new cost estimate.

    集中需求物料已经存在成本核算数据传递新的成本核算中去。

    youdao

  • Direct and indirect cost estimates of regulations and subsidies should be published before new regulations are put into law.

    法规、新津贴生效实施之前必须直接间接成本估算公诸于众。

    youdao

  • Cost estimates should encompass initial and ongoing costs within all affected areas, including both capital and expense items.

    成本评估应当所有受影响领域中围绕着初始成本运行成本来进行,包括资本项目开支项目。

    youdao

  • Cost estimates, scheduled start dates, and responsibility assignments to the level of the WBS at which control will be exercised.

    成本估算预定开始日期,采取控制的工作分解结构层次职责分配

    youdao

  • Everyone must agree that the project is viablethat is, that the project is worth doing, and the time and cost estimates are credible.

    每个人都必须认同这个项目可行的——就是说,这个项目是值得的,时间成本评估也是可信的。

    youdao

  • These are detailed lists of all the tasks that must be completed, the materials that must be purchased and the cost estimates for each.

    所有任务将被列入一个细致清单,所有的材料采购必须提前进行,当然,这些工程采购的费用也将被估算出来。

    youdao

  • Mueller's cost estimates may be on the high side - they include, for example, the opportunity costs of all the hours people spend waiting in security lines.

    穆勒成本估算可能偏高——例如他们估计中甚至包括人们警戒线等待时间机会成本

    youdao

  • For his part, he might spend his time on everything from a conceptual design to cost estimates to construction documents to phone calls with contractors.

    对于来说可能要花费他的时间一切概念设计成本估算施工文件承建商电话呼叫

    youdao

  • Earned value USES your original cost estimates saved with a baseline and your actual work to date to show whether the actual costs incurred are on budget.

    盈余分析使用比较基准一起保存原始成本估计值以及当前日期为止实际工时,显示实际成本是否预算范围内。

    youdao

  • View, on the one hand, in addition to the immediate need to consider the cost of the established income, also need a more long-term revenue cost estimates.

    从购房成本来看一方面除了需要考虑眼前既定收入成本之外,需要有一个长远收入成本预算

    youdao

  • Expenses incurred during the course of a project are recorded in specific job cost accounts to be compared with the original cost estimates in each category.

    项目实施过程中所发生支出记录具体工作成本报告中,以用来在每一成本项次下原始成本估算相比较

    youdao

  • On the one hand, in addition to the immediate need to consider costs beyond the established income, but also the need for a longer-term revenue cost estimates.

    一方面除了需要考虑眼前既定收入成本之外需要一个更长远收入成本预算

    youdao

  • These cost estimates must be approved by the OPERATOR Construction Supervisor or the OPERATOR Implementation Supervisor in writing prior to the start of any WORK.

    这些成本估价工程开工之前必须先得到运营商工程主管或者运营商执行主管的书面批准

    youdao

  • More elaborate forecasting systems might recognize peculiar problems associated with work on particular items and modify these simple proportional cost estimates.

    一些更为准确的方法可以反应详细工作劳动有关的特别问题恰当调整成本预测的比例。

    youdao

  • Cost estimates are based on non-sale New York City supermarket prices. If it's a cheap meal in NYC, we figure cooks in most other places in the country will spend even less.

    这些都能10美元以下准备好花费估计基于纽约市超市标价如果纽约一个便宜晚餐,那么我们认为全国绝大多数城市甚至便宜。

    youdao

  • It provides detailed information about the work to be done, activities, and milestones, cost estimates, resources required, and contract information for each element of the WBS.

    提供了WBS各个元素相关细节信息,包括:完成工作活动里程碑成本估算资源需求合同信息。

    youdao

  • Insufficient or inaccurate statistics lead to inaccurate cost estimates for the candidate access paths and is the most common reason for the selection of inefficient access paths.

    不充分准确统计数据导致候选访问路径评估不准确,也是选择低效访问路径常见原因

    youdao

  • The final assessment needs to include a description of what needs to change, ranked by priority, plus recommendations on how to make the changes, and cost estimates for each change listed.

    最后评估需要包括根据优先进行排列的需要修改部分的描述还有如何进行整改建议所列出每个整改项目的成本估计

    youdao

  • The final assessment needs to include a description of what needs to change, ranked by priority, plus recommendations on how to make the changes, and cost estimates for each change listed.

    最后评估需要包括根据优先进行排列的需要修改部分的描述还有如何进行整改建议所列出每个整改项目的成本估计

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定