• The method for determining the optimum sub-cutoff grade is developed.

    提出和建立了确定最优次边界品位的比较完整的理论方法。

    youdao

  • The cutoff grade systems are discussed, and it proposes that China should change from dual cutoff grade system to a single one.

    对矿石开采品位指标体系问题进行了探讨,认为我国必须从双指标体系转变到单指标体系。

    youdao

  • The model considers the mining order and the grade distribution in different deposit sections and has realized the time-space dynamic combination of the cutoff grade in underground mining.

    该模型考虑矿体的开采顺序和矿床不同区段的品位分布,实现了地下开采边界品位在时间和空间上的动态结合。

    youdao

  • Taking maximum net present value as an optimum target and considering factors in mining, milling and metallurgy, a dynamic optimum method for optimizing cutoff grade of underground orebody is given.

    以净现值最大为优化目标,同时考虑采、选、冶三阶段因素,给出了地下开采矿体边界品位动态优化的方法。

    youdao

  • Taking maximum net present value as an optimum target and considering factors in mining, milling and metallurgy, a dynamic optimum method for optimizing cutoff grade of underground orebody is given.

    以净现值最大为优化目标,同时考虑采、选、冶三阶段因素,给出了地下开采矿体边界品位动态优化的方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定