Let's say the project was estimated based on the labor of senior engineers (i.e., expensive), but the work is actually being performed by more junior-level engineers (i.e., at a lower cost).
让我们假设工程以高级工程师的劳动成本来评估(也就是高成本),但是实际上工作是由更多初级工程师来执行的(也就是低成本)。