• The first coat of paint must be applied maximum3 hours after the preparation of the surface if the relative humidity of the air is between50% and80%.

    如果空气相对湿度介于50%-80%,底层油漆必须表面处理最多3小时内涂覆。

    youdao

  • Minor cracks holes and surface defects shall be made good with exterior grade water-mixed filler or masonry cement before application of the primer or first coat of paint.

    第一次应用涂底漆之前较小裂缝表面缺陷采用浆、水混合填料或水泥浆和砌浆进行填塞及填充。

    youdao

  • During construction, any damage to the shop primed surface shall be cleaned by power tools and directly painted with the first coat primer according to paint scheme without touch up of shop primer.

    施工期间,车间底漆表面任何损坏应该电力工具进行清除根据涂装计划直接一度漆而不用进行底漆修补。

    youdao

  • During construction, any damage to the shop primed surface shall be cleaned by power tools and directly painted with the first coat primer according to paint scheme without touch up of shop primer.

    施工期间,车间底漆表面任何损坏应该电力工具进行清除根据涂装计划直接一度漆而不用进行底漆修补。

    youdao