The number of medical consultations in Garrissa have doubled and even tripled over the last week compared to the pre-flood period.
在Garrissa,与洪水前时期相比,求诊人数翻了一番,在上周内甚至增长了三倍。
Because of water level limitation, the Jinghong reservoir has to be operated at a low level during a perennial flood period.
由于受水位限制,景洪水电站在常年洪水时,水库必须在低水位运行。
On the basis of statistical analysis, we established a physical model for operational flooding prediction in the flood period in Xiangtan.
在统计分析的基础上,我们建立了日常业务应用的湘潭汛期洪涝预报物理模型。
The main reason was that the operation effect of Danjiangkou reservoir for runoff was more in the low water period than in the flood period.
主要原因是丹江口水库的调节作用,对汉江中下游径流量的影响枯水期远远大于汛期。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
The method is of significance in real-time dispatching operation on reservoir in flood period.
此法对汛期水库的实时调度运行具有意义。
Spring flood period of poor water quality, water quality levels ranged between class II and III , other times, water quality stability in the level II .
春汛期间水质较差介于II类和III类之间,平水期和冰封期稳定于II类水质。
The results showed that, anomalously small (weak) SOI and the lag effect of El Nino are good indications to the short-term climate prediction of Xiangtan flooding in flood period.
结果表明,南方涛动指数异常偏负(弱)以及厄尔尼诺事件的滞后影响对湘潭汛期洪涝的短期气候预报有很好的指示性。
Superior scouring resistance capability is required for the bank slopes of double-lane shiplock of Changzhou Hydraulic Complex, due to local difficult flood protection and long flood period.
在长洲水利枢纽双线船闸工程施工中,由于当地汛期防汛任务重,汛期长等特点,对于船闸的左右两侧边坡的防冲刷提出了很高的要求。
Through studying Longyangxia reservoir reasonable operation mode, Gongboxia hydro-power station's flood period scheme and improvement flood period standard scheme are established in this paper.
通过龙羊峡水库合理运行方式研究,确定公伯峡水电站渡汛方案以及提高渡汛标准方案。
Through studying Longyangxia reservoir reasonable operation mode, Gongboxia hydro-power station's flood period scheme and improvement flood period standard scheme are established in this paper.
通过龙羊峡水库合理运行方式研究,确定公伯峡水电站渡汛方案以及提高渡汛标准方案。
应用推荐