After full consideration of the capacity improvement by the post construction reinforcement, the design of the main pile can reduce the requirements of the capacity.
在充分考虑工后加固承载力将提高的情况下,进行主体桩的设计,从而可以降低对加固前主体桩承载力的要求。
After full consideration of the capacity improvement by the post construction reinforcement, the design of the main pile can reduce the requirements of the capacity.
在充分考虑工后加固承载力将提高的情况下,进行主体桩的设计,从而可以降低对加固前主体桩承载力的要求。
应用推荐