• When the hydrological data are input, the model can achieve continuously modeling the total phosphorus output of Heihe river basin.

    输入水文资料模型程序能够实现连续模拟黑河流域输出

    youdao

  • Based on the experimental data and the tank model, the authors design the different hydrological process models and parameters for the typical rainfall events.

    根据实验数据应用水箱模型,确定出典型降雨过程作用阶段水文过程模型参数

    youdao

  • Real-time flood forecast is a prediction for future flood events or characteristics by adopting watershed hydrological model or methods on the basis of real-time hydrological and meteorological data.

    实时洪水预报根据实时的水文气象资料采用流域水文模型方法未来洪水过程或特征做出预测预报。

    youdao

  • Precipitation is not only a kind of essential data to a hydrological or atmospheric numerical model, but also a sort of key information for flood monitoring and warning.

    实际估测区域降水量不仅进行洪水监测、发布洪水警报起指导作用,而且是各种水文大气数值模式用到的重要的实测原始资料之一

    youdao

  • Compared with the hydrological model data, the result also proved the GRACE based water storage estimating the total terrestrial water storage.

    水文模型比较验证性实验结果,证明GRACE数据估算储量变化是陆地水储量变化的总量

    youdao

  • Then, the calibration and validation of TOPOG model was done using the meteorological and hydrological data measured at the outlet of the watershed in 2001 and 2002.

    然后,用祁连山露沟小流域2001年、2002年气象水文数据对改进后TOPOG模型进行率定和检验

    youdao

  • Then, the Xin'anjiang Model is applied for runoff production in each grid element where rain data measured by radar at Puyang station is utilized as the input of the hydrological model.

    然后,将阜阳雷达观测数据经过订正校准后作为研究区内栅格单元雨量输入,并每一栅格上应用新安江模型构建流模型;

    youdao

  • Given the observed hydrological data, the model can estimate the posterior probability distribution of each location of change-point by using the Monte Carlo Markov Chain (MCMC) sampling method.

    模型核心部分是根据观测资料通过蒙特卡洛马尔科夫随机抽样的方法估计变点位置后验概率分布

    youdao

  • The two methods are validated by running the Xin'anjiang model at a daily time step from the monthly data, and the model outputs are more accurate than the monthly hydrological model.

    然后时间长为日,运行新安江模型模拟径流过程验证了解方法的合理性。

    youdao

  • As a case study of the model, hydrological dynamics of soil in Changling, Jilin province was simulated with results verified to be consistent with the observed soil moisture data in 1997.

    利用长岭1 997年土壤湿度实测资料土壤水分模型进行了验证模拟结果很理想。

    youdao

  • As a case study of the model, hydrological dynamics of soil in Changling, Jilin province was simulated with results verified to be consistent with the observed soil moisture data in 1997.

    利用长岭1 997年土壤湿度实测资料土壤水分模型进行了验证模拟结果很理想。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定