• The pipe section of the immersed tunnel is the large-volume concrete structure, which is complicated in the structure shape.

    沉管隧道工程中的管段为大体积混凝土构件,结构形式较为复杂。

    youdao

  • Depending on different conditions in different projects, construction methods for immersed tunnel vary with their respective features.

    由于工程建设条件的不同,沉管隧道建设的方法也各具特点。

    youdao

  • Some key issues related with excavation by a super-large shield machine and the design and construction of immersed tunnel in deep seawater and torrent conditions are also listed.

    最后,对超大型盾构机长距离掘进与深水急流海底沉管隧道的设计、施工等列出其中的若干技术关键问题。

    youdao

  • With different construction method, (from Chapter 1 to Chapter 3), they are immersed tunnel, underwater shield tunnel and the underwater tunnel by using mining method respectively.

    第1 -3章分别是按施工法区分的水底沉管法隧道、水下盾构法隧道、水下矿山法隧道。

    youdao

  • With different construction method, (from Chapter 1 to Chapter 3), they are immersed tunnel, underwater shield tunnel and the underwater tunnel by using mining method respectively.

    第1 -3章分别是按施工法区分的水底沉管法隧道、水下盾构法隧道、水下矿山法隧道。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定