• Notice of readiness to load shall be tendered with clean holds hatch open and ready in all respect to load at any time after vessel has arrived at loading port whether in berth or not.

    货物备妥之后无论船舶是否停靠在泊位,备通知船舶船舱打开可以随时进行装运的条件下发出。

    youdao

  • To my know ledge, most of the European port have an average loading rate of 250 ton per hatch per weather work day.

    大多数欧洲港口每个舱口每个晴天工作日平均装船为250

    youdao

  • The rate of loading should be 300 metric tons per workable hatch.

    每个可使用舱口装货应为300公吨。

    youdao

  • Loading at Hatch No. 4 stopped owing to the breakdown of the winch.

    起货机出故障装货停止了

    youdao

  • Loading at Hatch No. 4 stopped owing to the breakdown of the winch.

    起货机出故障装货停止了

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定