Based on the interaction, the analysis of the longitudinal force of no 38 turnout connected with CWR is made.
采用建立在导轨、心轨与基本轨相互作用基础上的纵向力计算方法,对3 8号无缝道岔纵向力进行了计算分析。
Based on the interaction, the analysis of the longitudinal force of no 38 turnout connected with CWR is made.
采用建立在导轨、心轨与基本轨相互作用基础上的纵向力计算方法,对3 8号无缝道岔纵向力进行了计算分析。
应用推荐