Peter wants to become a mining engineer.
彼得想要当一个采矿工程师。
Powell was trained as a mining engineer.
鲍威尔作为一个矿业工程是受过培训。
William Bradford Shockley was born in London, where his father, a mining engineer, and mother, a mineral surveyor, were on a business assignment.
威廉·布莱德福?萧克利(WilliamBradford Shockley)出生于伦敦,他的父亲是采矿技师,母亲则为采矿勘测员。
The goal is the minimum of the mining engineer, the best safety product, the lowest breaking of environment, the highest automation of production.
其目标是矿井井巷工程量最小、生产最安全、对环境的破坏程度最低、生产自动化程度最高。
"It's a good discovery, with a lot of potential of discovering more deposits in the future," the mining engineer, who did not want to be quoted, said.
“这是一个很好的发现与一对在未来发现更多存款的潜力很大,”采矿工程师,谁也不想被引述说。
Imported bricks were only used in joints and window and door openings. It is convenient and extremely beautiful. This is, for example, the house of a mining engineer.
从外面运来的石头仅仅被用在房屋的接缝,窗子以及门洞上。这样不仅简易方便而且美观。照片中采矿工程师的住房,就是如此。
For example, some in this field might work with a mining engineer to coordinate the extraction process and extract the metal from the ore once it has been mined.
例如,从事这一领域的人可能与采矿工程师共同研究提取工艺,从矿石中提取金属。
We ranged in age from six-year-old Lü Keyi to his seventy-year-old grandfather, Liu Gongsheng, a retired mining engineer, who was escorting his wife, Huang Xueqing, in her wheelchair.
团队的成员年龄不一,下至六岁的陆可怡(音),上至她七十岁的祖父刘功生(音),他是一位退休的矿业工程师;他的老伴儿黄雪晴坐在轮椅上。
Hearst, the son of millionaire mining engineer George Hearst, enrolled at Harvard in 1885 and acted as the first business manager of the Harvard Lampoon, the school's humor publication.
Hearst是一名百万富翁矿业工程师的儿子,在1885年在哈佛注册并担任哈佛大学幽默杂志HarvardLampoon的首任商业经理。
1977-1982 Technician and Assistant Engineer of Ventilation District of Jinhuagong Mine of Datong Mining bureau.
1977- 1982大同矿务局晋华宫矿通风区技术员、助理工程师DatongMining bureau。
The engineer studies seabed mining technology.
这位工程师研究海床采矿技术。
In the end of the paper we get the conclusion, extension engineer theory and extension information analysis approach prepare basic theory for data mining and are good techniques of data mining.
最后本文得出的结论是,可拓工程方法和可拓信息分析方法为数据挖掘提供了更多的理论基础,同时也为数据挖掘提供了有效的挖掘工具和方法。
The engineer examined the engine of the shining mining machine for stomach-ache.
工程师检查了那 台闪闪发亮的采矿机的发动机看看它有没有肚子疼。
Provided that, roof structure 's stability analysis of ShenDong Mining Field is built on the static relation, there will be much different from the engineer practice.
若将神东矿区顶板结构的稳定性分析建立在“静态”关系基础上,这与其工程实践有较大出入。
Provided that, roof structure 's stability analysis of ShenDong Mining Field is built on the static relation, there will be much different from the engineer practice.
若将神东矿区顶板结构的稳定性分析建立在“静态”关系基础上,这与其工程实践有较大出入。
应用推荐