The Nanjing metro is a metro system serving the city of Nanjing, Jiangsu, China.
南京地铁是一个服务于中国,江苏,南京的城市地铁系统。
This article mainly compares the signal systems between line 1 and line 2 in Nanjing metro.
文章主要以南京地铁一号线及二号线的信号系统进行对比。
This paper introduces the difference of Nanjing Metro vehicle system between the line 2 and the line 1.
文章详细介绍了南京地铁二号线车辆系统与一号线之间的区别。
The application of a freezing method to construction of the connected aisle for Nanjing metro project is introduced.
南京地铁一期工程联络通道采用冻结法施工中,对冻结盐水温度、冻土温度、地表变形等方面进行了跟踪监测;
Welcome to Nanjing Metro Line S1. This train is heading to Lukou International Airport Station. The whole trip takes about 35 minutes.
欢迎乘坐南京地铁S1号线,本次列车开往禄口国际机场站,全程耗时约35分钟。
TA11 bid for first stage of Nanjing Metro Line 2 is constructed with shield method, including Yixianqiao, Daxinggong and Xinjiekou stations.
南京地铁2号线一期工程TA11标包括逸仙桥站—大行宫站—新街口站,采用盾构法施工。
Then, based on the Phrase One Project of Nanjing Metro North-South Line, some main methods dealing with the shallow underwater ground are provided.
结合南京地铁南北线一期工程,提出超浅覆土情况下水底隧道盾构施工应采取的工程对策。
The main conclusions above have been applied to the design of segment in Nanjing metro and can be applied as reference in the other construction of metro in China.
以上本论文所提出的主要结论,在南京地铁的设计中己经应用实施,并可在国内其它地铁建设中参考应用。
With the construction of Nanjing metro Line 1 as the background, this paper introduces a design option for the Passenger Information System (PIS) in metro stations.
结合南京地铁1号线建设,介绍地铁车站乘客信息系统的一种设计方案。
In light of the rail potential anomalies happend in Nanjing metro Line 1, this paper provides a general analytic method, discuses the different reasons for the elevated rail potential.
结合南京地铁1号线轨道电位异常的问题,提出了轨道电位异常分析研究的一般方法,以及针对不同原因导致轨道电位升高的处理方法。
Lister's pioneer prestigious business center, conveniently located on West Nanjing Road near metro line 2 in the heart of Shanghai's Jing'an CBD.
锦江向阳大厦为利仕达的首家商务中心,坐落在交通便利的南京西路,在地铁2号线南京西路口,是静安商务中心核心地带。
Xinjiekou station of Nanjing No. 2 metro will solve the problem of traffic by the temporary bridge, whose framework is a "321" assembled steel highway bridge.
南京地铁二号线新街口站拟采用便桥疏解交通,便桥结构采用“321”装配式公路钢桥。
The next station is Nanjing South Railway station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.
前方到站,南京南站,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。
We are now at Nanjing South Railway Station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.
南京南站到了,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。
In the nanjing road station after get off, our reporter from metro line 2 transfer line 10.
在南京东路站下车后,本报记者从地铁2号线转乘10号线。
The Mansion is located in the heart of Jing'an CBD and minutes walk from Plaza 66, the Ritz Carlton and West Nanjing Rd metro station.
老洋房位于静安商业中心地段,恒隆广场、波特曼丽思卡尔顿酒店及南京西路地铁站就在几分钟步行范围内。
Traffic: Metro line 2 or line 10, Nanjing Dong Road stop, 6 minutes' walk.
交通:地铁,2,10号线南京东路站,出站步行距离6分钟。
No. 4 subway station next to the Nan Pu Bridge Road, turn 65, or Metro Line 2 Nanjing East Road station taxi after about starting fee.
地铁4号到南浦大桥站下转65路,或地铁2号线南京东路站下后打车约起步费。
Take Metro Line 2 and get off at East Nanjing Road Station. Then go straight along the …
乘坐地铁2号线到南京东路站,出站后向东走到底就是啦。
Hotel is extremely closed to the metro station(Nanjing road east, line2) and it takes only 5minutes to reach Lujiazui commercial center by going through the Yan'an road tunnel.
酒店紧邻南京东路地铁站,并且驱车经延安东路隧道至浦东陆家嘴中央商务区仅5分钟。
Hotel is extremely closed to the metro station(Nanjing road east, line2) and it takes only 5minutes to reach Lujiazui commercial center by going through the Yan'an road tunnel.
酒店紧邻南京东路地铁站,并且驱车经延安东路隧道至浦东陆家嘴中央商务区仅5分钟。
应用推荐