• It is introduced how to regulate the process and restore a normal operation of the sewage treatment system on condition of a loading shock.

    在此介绍了针对负荷的冲击,如何调整工艺,恢复污水处理系统正常运行。

    youdao

  • The analysis of solid flux could be used to change the operation condition when the loading rate was changed so as to ensure the normal running of the secondary sedimentation tank.

    当负荷发生变化时,可以通过固体通量分析来改变操作条件,以保证二沉池正常运行。

    youdao

  • The analysis of solid flux could be used to change the operation condition when the loading rate was changed so as to ensure the normal running of the secondary sedimentation tank.

    当负荷发生变化时,可以通过固体通量分析来改变操作条件,以保证二沉池正常运行。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定