Proving the feasibility of the model through the application of the nuclear power project management maturity evaluation model.
并通过核电工程项目管理成熟度评价模型的应用,证明了模型的可行性。
Finally, the thesis systematically explains the application value and condition of the evaluation model of nuclear power project risk, and also expects its application foreground.
文章最后对核电项目风险评价模型的应用价值和应用条件做出了系统阐述,并就其应用前景做出了展望。
The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test.
分析表明,核电工程建设的关键路径是核岛土建、核岛安装、与一回路冷态调试相关的单系统调试及联合调试。
Nuclear power project prophase file refers to the documents produced during the project - licensing, approving, bidding, surveying, design, and construction preparation before project kickoff.
核电项目前期文件是指核电工程开工以前在立项、审批、招投标、勘察、设计以及工程准备过程中形成的文件。
Nuclear power project prophase file refers to the documents produced during the project - licensing, approving, bidding, surveying, design, and construction preparation before project kickoff.
核电项目前期文件是指核电工程开工以前在立项、审批、招投标、勘察、设计以及工程准备过程中形成的文件。