• A proposal to build the first offshore wind farm in the United States was given the go ahead.

    在美建立首座陆地风力发电站的提案获得批准。

    youdao

  • A high availability is therefore crucial to ensure the economic success of an offshore wind farm.

    因此,高可利用率是海上风场经济效益的重要保证。

    youdao

  • The paper reviews development status of abroad offshore wind farm briefly and the key technology related with offshore wind farm.

    与陆上风电场相比,近海风电场建设的技术难度较大。

    youdao

  • Finally, it is described that the power electronics device will be applied widely in large-scale offshore wind farm in the future.

    最后,描述了未来大容量海上风电场将更广泛应用电力电子装置。

    youdao

  • There is no offshore wind farm yet in the U.S., but the controversial Cape wind project near Nantucket Island is moving closer to approval.

    美国还没有海上风电场,但是颇具争议的、靠近楠塔基特岛的鳕鱼岬海上风电场项目即将获得批准。

    youdao

  • There is no offshore wind farm yet in the U. S., but the controversial Cape wind project near Nantucket Island is moving closer to approval.

    美国还没有海上风电场,但是颇具争议的、靠近楠塔基特岛的鳕鱼岬海上风电场项目即将获得批准。

    youdao

  • The simulation model for the grid connection of offshore wind farm via VSC-HVDC based on the fixed pitch constant speed wind power generation system is established.

    建立了基于定桨距恒速风力发电机系统的海上风电场直流并网仿真模型,并对风电场几种典型运行情况的并网性能进行了仿真分析。

    youdao

  • Presentation on the planning and siting, overall layout, WTG foundation, submarine cable. observation etc. viewed as critical technical solutions in the design of Shanghai Donghai Offshore Wind Farm.

    系统介绍上海东海大桥海上风场设计中的规划选址、总体布置、风机基础、海缆、观测等设计关键技术及解决方案。

    youdao

  • The study limits potential wind farm locations to rural, nonforested sites (both on land and offshore) with high wind speeds.

    这个研究仅限于能被建设在于农村地区、无林地区(包括陆上和海上)这些风速较大地区的风力发电厂。

    youdao

  • Thirdly, it analyzes the characteristics of DC and AC grid connections based on a case study of an offshore wind-farm designed and implemented by ABB Company in Germany.

    以ABB公司所做的德国某海上风电场的联网案例来对比分析直流联网和交流联网的各自特点。

    youdao

  • Thirdly, it analyzes the characteristics of DC and AC grid connections based on a case study of an offshore wind-farm designed and implemented by ABB Company in Germany.

    以ABB公司所做的德国某海上风电场的联网案例来对比分析直流联网和交流联网的各自特点。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定