• Fisherman Ray Turner hand-built the V-shaped stone overflow dam, in the East Branch of the Delaware River in New York.

    渔民雷·特纳在纽约德拉瓦河的东支流手工建造了这个V 字形石头溢流堰,或称鱼梁。

    youdao

  • Construction of the overflow dam.

    建设溢流堰。

    youdao

  • Preparing a floating bridge on site of the to-be overflow dam.

    在未来溢流堰的建设场地准备浮桥。

    youdao

  • Earth dam consists of shallow sand and is located between the plant and the overflow dam. It is 2800 meters long and 600 meters wide.

    土坝由浅沙筑成,长2800米,宽600米,位于电厂与溢流堰之间。

    youdao

  • Fisherman Ray Turner hand-built the V-shaped stone overflow dam, or weir, in the East Branch of the Delaware River in New York; its walls funnel eels into a wooden collecting rack.

    渔民雷·特纳在纽约德拉瓦河东支流手工建造了这个V字形石头溢流堰,或称鱼梁。从它的墙壁漏过的鳗鱼进入木制的收集架内。

    youdao

  • The unusual shape broad tail pier is adopted in Baishi reservoir overflow dam.

    白石水库溢流坝采用异型宽尾墩挑流消能方式。

    youdao

  • The reinforced earth structure is popularized in the earth-retaining wall, but the reinforced earth overflow dam is few.

    加筋土结构在挡土墙中的应用已较为普及,但作为溢流拦河坝的坝体结构目前却较少。

    youdao

  • Dynamic model test of overflow dam section of Three Gorges Project was carried out on a large-scale vibration actuating system.

    利用大型三向六自由度地震模拟振动台,对我国三峡工程溢流坝段进行了动力模型试验。

    youdao

  • The results suggest that it is feasible to carry out maths modelling of the overflow dam flow with the maths model established in this paper.

    模型试验验证结果表明,采用本文建立的数学模型对溢流坝水流进行数值模拟是可行的。

    youdao

  • The upper reservoir overflow dam of Yangjiang pumped storage power station shows the characteristics of high waterhead, narrowing river bed in dam site and steep slope.

    针对阳江抽水蓄能电站上库溢流坝具有高水头、坝址河床狭窄、坡度陡峭等特点,通过水力模型试验研究优化了溢流坝及其消能工体型,解决了溢流坝的消能问题。

    youdao

  • The general situation of the project of Huizhou Pumped Storage Power Station was introduced, and the mode of energy dissipation by hydraulic jump was suggested for upper reservoir overflow dam.

    介绍惠州抽水蓄能电站工程概况,建议将上库溢流坝挑流消能改为底流消能方式。

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定