And adjustment in rock strata means that loose soil will sink or heave.
岩层的调整意味着松动了的泥土将会下沉或者鼓起。
Diagenetic time of upper Tertiary strata in Xixiayuan engineering is short, and the rock and soil exist at the same time, which is transitional strata between rock and soil.
西霞院工程上第三系地层成岩时间短,岩、土性质并存,是介于岩石与土之间的过渡性地层。
According to the complex geological phenomena in rock and soil medium and the features of strata, a three dimensional strata model is established.
根据岩土介质中复杂的地质现象及其地层的层状展铺特性,建立了三维地层模型。
The nail-dog and rock-bolt technique is often used in the supporting construction of such complicated slopes as artificial fill, sandy graves strata, sand deposits and muddy soil.
通过实践总结了土钉及锚杆技术在人工填土、砂卵石、砂层、淤泥质土等复杂地层边坡支护施工的处理方法。
The vital problems to be solved in Shendong mine are the dynamic pressure damage of thin rock strata roof under thick sandy soil soft stratum and the loss of water and soil under mining.
浅埋煤层薄基岩厚砂土松散层顶板动压灾害和采动水土流失是神东矿区急需解决的重大问题之一。
The vital problems to be solved in Shendong mine are the dynamic pressure damage of thin rock strata roof under thick sandy soil soft stratum and the loss of water and soil under mining.
浅埋煤层薄基岩厚砂土松散层顶板动压灾害和采动水土流失是神东矿区急需解决的重大问题之一。
应用推荐