Shuibuya dam is currently the highest concrete face rockfill dam in the world.
水布垭面板堆石坝是目前世界上最高的面板堆石坝。
The plinth is an important part for a concrete faced rockfill dam. Its major role is to prevent seepage.
趾板是混凝土面板堆石坝的重要组成部分,其主要作用是防渗。
The shear strength of the rockfill is of high nonlinearity, but the stress path almost does not influence the shear strength.
堆石料抗剪强度具有显著的非线性特征,而应力路径对其抗剪强度影响极小。
The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.
小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。
The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.
在深覆盖层地基上修建高土石坝,其防渗体系的可靠性是一项关键技术问题。
The Concrete facing is a main imperious structure of rockfill dam.
混凝土面板是堆石坝的主要防渗体。
The maximum dry density is a mainly index of compaction quality for rockfill material.
最大干密度是确定填石料压实质量的一个主要指标。
The stress-strain behaviour of rockfill is seriously influenced by the particle breakage.
颗粒破碎对堆石体的应力应变特性具有十分重要的影响。
The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。
A new in-situ direct shear testing method for large-grained rockfill materials is introduced.
介绍了一种适用于大颗粒堆石材料的新型现场直剪试验法。
For the concrete faced rockfill dam, the deformation control is the key to the design and construction.
对面板堆石坝而言,坝体变形控制是设计和施工的首要问题。
The plinth is an important part for a concrete faced rockfill darn. Its major role is to prevent seepage.
摘要趾板是混凝土面板堆石坝的重要组成部分,其主要作用是防渗。
The new dam consists of an earth core rockfill embankment and a concrete transition at the left abutment.
新建坝包括一座土质心墙堆石堤坝和一个位于左坝肩的混凝土过渡带。
But many tests show the shear strength of the rockfill material is a nonlinear function of the normal stress.
试验表明堆石材料的抗剪强度更符合非线性表达式。
Prediction of earthquake induced permanent deformation of concrete faced rockfill DAMS is of great importance.
混凝土面板堆石坝地震永久变形的预测非常重要。
The face slab rockfill dam of Shuibuya Hydropwer Station is the highest one being built in the world at present.
水布垭水电站混凝土面板堆石坝,属目前在建的世界第一高面板堆石坝。
In combination with the Yemen's actual conditions, it is reasonable to adopt overflow concrete face rockfill dam.
结合也门国的实际情况,采用溢流混凝土面板堆石坝比较适用。
The experience of quickly constructing face rockfill dam of Yinzidu hydropower station is introduced in this article.
本文介绍了引子渡面板堆石坝填筑快速施工的经验。
The effects of the stratification of rockfill on the seepage field and the stability of the dam slope were highlighted.
指出填料严重分层后对坝体渗流场的影响以及对坝坡渗透稳定性的不利影响。
Two special issues were studied on rockfill materials for the main dam, which was built on an inclined bedrock surface.
针对宜兴抽水蓄能电站上库主坝建在倾斜基础面上的实际情况,对坝体堆石料特性进行了两项特殊研究。
Stress, deformation and stability analysis of the same cemented-rockfill dam are compared before and after optimization.
比较了优化前后坝体的应力、变形与稳定分析结果。
Songshan concrete face rockfill dam is the head project of Songshan diversion works for Songjianghe water power station.
松山混凝土面板堆石坝是松江河水电站松山引水枢纽头部工程。
The theory and method of health diagnose for earth-rockfill dam are hot issues in the research domain of dam safety monitoring.
本文结合土石坝特点,应用力学和数学理论展开对土石坝健康诊断理论与方法的研究。
Permeability performance of rockfill is closely related to the particle shape, particle-size and its distributing characteristics.
砂砾石填料的渗透特性与颗粒的形状、大小及分布特征关系密切。
The concrete crushing type sidewall technology is a new method for constructing the upstream side slope of concrete face rockfill dam.
混凝土挤压式边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
The results show that it is feasible to make use of local materials to construct high concrete faced rockfill dam for Shuibuya project.
试验研究结果表明,就筑坝材料来说,水布垭工程就地取材,修建高混凝土面板堆石坝是可行的。
This solution can be widely promoted for general rockfill slope protection in other fields such as railway , highway , river dike etc .
这一技术在铁路、公路和拦河堤坝等一般堆石坡面施工中的推广应用前景也十分广阔。
Particle breakage of rockfill materials is serious under high pressure, and its influence on deformation of rockfill cannot be ignored.
高应力作用下堆石料的颗粒破碎严重,其对堆石体变形的影响不可忽视。
Through calculation and synthetical analysis, the paper draws conclusions about earthquake response of rockfill DAMS on deep overburden.
通过实例计算和分析,表明复盖层的分布对其上堆石坝的地震响应影响较大。
As the main material in constructing compacted rockfill dam, the engineering properties of rockfill have a vital effect on DAMS security.
石碴料作为堆石坝的主要筑坝材料,其工程性质对堆石坝的安全性有至关重要的影响。
应用推荐