• The construction of the roller compacted concrete dam needs four dry seasons and four flood seasons to reach the design elevation.

    碾压混凝土拦河坝工程须经过四个枯水期四个汛期的施工才能达到设计高程。

    youdao

  • Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).

    胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。

    youdao

  • To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.

    理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。

    youdao

  • A new method for anti - seepage coating of roller compacted concrete dam by using wet - mix shotcreting polyacrylate emulsion cement mortar(PAE mortar) is presented in this paper.

    针对碾压砼坝上游面的防渗,提出了湿法喷涂丙乳砂浆集中防渗的新方案。

    youdao

  • A new method for anti - seepage coating of roller compacted concrete dam by using wet - mix shotcreting polyacrylate emulsion cement mortar(PAE mortar) is presented in this paper.

    针对碾压砼坝上游面的防渗,提出了湿法喷涂丙乳砂浆集中防渗的新方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定