• Sand fill and compaction are essential factors of Expendable Pattern Casting(EPC).

    砂 的填充及紧实是实型造型工艺技术中的关键因素。

    youdao

  • Product role: Lead is widely used in the proportion of sand fill, anti-toxic rays.

    产品作用:铅砂广泛应用于比重填料,防有毒射线。

    youdao

  • If you want to fill a bag with sand, you have to control a kind of truck on wheels and move it into the correct place.

    如果你想把一个袋子装满沙子,你必须控制一种有轮子的卡车,并把它移到正确的位置。

    youdao

  • The more you do to fill in the holes and cracks, then sand it, the easier it is to paint -- and the better the room looks.

    开始粉刷之前,需要填补各处的窟窿和缝隙,然后打磨平整。这些工作做得越完善,刷漆就越容易,房间就会越漂亮。

    youdao

  • Save your old milk jugs and fill them with sand, change or water for weights with ready-made handles.

    留下你旧的牛奶壶并装满沙子、硬币或者水,并用已有的手柄来做举重。

    youdao

  • Channel deposits consisting of sand silt and clay fill the valleys cut by a river system.

    河道沉积由砂,粉沙和粘土组成,充填于河流切割的河谷之中。

    youdao

  • The nail-dog and rock-bolt technique is often used in the supporting construction of such complicated slopes as artificial fill, sandy graves strata, sand deposits and muddy soil.

    通过实践总结了土钉及锚杆技术在人工填土、砂卵石、砂层、淤泥质土等复杂地层边坡支护施工的处理方法。

    youdao

  • Channel deposits, consisting of sand, silt and clay, fill the valleys cut by a river system.

    河道沉积由砂,粉沙和粘土组成,充填于河流切割的河谷之中。

    youdao

  • The key basic technology in full mould casting process includes: material and formation of pattern, coating, vibratory fill of moulding sand as well as molten metal filling.

    实型铸造法的关键基础技术包括:模样的材料及成形、涂料、型砂的振动充填、金属液的充填。

    youdao

  • The structure of sand storage silo for the use of coarse sand cemented fill and its pulp discharge method have been studied in this paper.

    本文研究了粗粒砂胶结充填砂仓的结构及其卸料方法。

    youdao

  • Strangely, the mountain spring anyhow brought some bright yellow gold sand and got to fill the small hole.

    奇异的是,山泉不知从哪里冲来黄澄澄的金砂,渐渐的填满了小坑。

    youdao

  • Joint filling 48 hours after macadamize, use the mixture of cement and crushed sand with 1:0.5 to fill, after that, use the water to clean roughly the tile surface.

    铺装48小时后进行填缝,用水泥与石粉以1:0 . 5的比例确实填满砖缝,并确实地把砖面用清水清洗干净。

    youdao

  • Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).

    胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。

    youdao

  • The first stage earth rock fill cofferdam of Three Gorges Project is mainly composed of the weathered sand, excavated spoil and rock blocks.

    三峡水利枢纽一期土石围堰堰体主要由风化砂、石渣和块石填筑而成。

    youdao

  • It has the advantages of low cost and simple technical process and can fill the depleted reservoirs. It is suitable for sand control in thermal recovery heavy oil Wells in high - cycle huff and puff.

    该防砂技术具有费用低、工艺简便、见效快、填补油层亏空等特点,适应稠油油藏热采高周期吞吐油井防砂。

    youdao

  • It has the advantages of low cost and simple technical process and can fill the depleted reservoirs. It is suitable for sand control in thermal recovery heavy oil Wells in high - cycle huff and puff.

    该防砂技术具有费用低、工艺简便、见效快、填补油层亏空等特点,适应稠油油藏热采高周期吞吐油井防砂。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定