So the plant is much more complicated than simply the reactor and the steam and the power conversion system.
所以,电站是更为复杂,比起简单的反应堆和蒸汽,和能量转化系统。
Concentrating Solar at Nevada Solar One near Las Vegas, oil piped down long rows of reflectors soaks up focused sunlight, becoming hot enough to make steam and run a 64-megawatt power plant.
集中式太阳能在拉斯维加斯附近内华达州的一个太阳能场,管道般长排下来的反射镜片吸收了太阳光聚焦,转化足够的热量生产蒸汽驱动一个64兆瓦的发电厂。
Sixty miles to the northeast, near a spot where golden-red lava streams meet the sea in clouds of steam, a small power plant extracts heat from the volcanic rock beneath it to generate electricity.
距离东北60英里的地方,可以看到金红色的熔岩流与蒸汽云海的交融,小型的发电厂便在此通过提取火山岩石下的热量来发电。
This Paper introduced structure reform for main steam pipe of heat and power plant at a Petrochemical factory.
本文简述了某炼油厂热电站主蒸汽母管的结构改造和动力设备的调优运行。
Siting of a sludge treatment system at a power plant, where high-pressure steam generated by the SCWO process could be fed into a steam header, would provide greater economic benefit.
若选择把污泥处理系统坐落在发电厂内,超临界水氧化装置所生产的高压蒸汽可融入发电厂内现有的高压蒸汽总管,这样可以为发电厂带来经济效益。
Design and research of visual program for thermal diagram optimization of the steam power plant are introduced.
介绍了用于舰船蒸汽动力装置热线图优化的可视化程序设计与研究。
Turbine is an important equipment of thermal power plant. Through turbine, thermal energy of steam transforms into mechanical energy, to provide power for generator.
汽轮机是火电厂的重要设备,通过汽轮机,蒸汽的热能转化为机械能,为发电机发电提供动力。
The condenser leakage caused by corrosion strongly influences water steam quality and threatens safety and economical operation for power plant.
凝汽器的腐蚀泄漏严重影响机组的水汽品质,威胁机组的安全经济运行。
Through comparison, CFBB is considered the best boiler type in the construction of thermal power plant, steam power station and heat supplying station.
通过比较认为,循环流化床锅炉是建设热电厂、蒸汽热力站和采暖供热站应该首先考虑采用的炉型。
The steam pipe and correlative branch pipe of power plant are detected to appear thermal diffuse crack, which influence the normal run of the generator severely.
发电站蒸汽管道的支管连接部位以及与之相连接的支管接管座处出现的热疲劳裂纹,严重影响了发电机组的安全运行。
The existing problems and influencing factors of the reheated steam control system of No. 4 Unit in Zhangjiakou Power Plant are presented.
介绍了河北省张家口发电厂4号机组再热汽温调节系统存在的问题及其影响因素。
Universal calculation software for steam turbine thermal tests is a computer technology practically applied to steam turbine and other thermal power equipments tests in power plant.
汽轮机热力试验通用计算软件是计算机技术在火电厂汽轮机热力试验及其它热能动力设备试验工作中的实际应用。
The sodium leak in the steam generator of LMFBR Nuclear Power Plant can result in Sodium-Water reaction and production of hydrogen.
液态金属钠冷快堆电站蒸汽发生器的钠泄漏会导致钠水反应和氢的产生。
The fundamentals of the steam power plant heat balance analysis are reviewed with a computer program for performing such an analysis being outlined.
在对蒸汽动力装置热平衡分析法认真分析的基础上提出了一种计算机一设计者相互作用的计算机程序方案。
Described is a method of superheated steam regulation for the heat recovery boiler of a gas steam combined cycle power plant, the so called boiler drum saturated steam attemperation.
介绍了燃气—蒸汽联合循环电站余热锅炉过热蒸汽调温的一种方法—自身饱和蒸汽减温。
Efficiency analysis and calculations for gas steam combined cycle power plant are described.
对燃气-蒸汽联合循环发电效率进行了分析与计算。
Heat rate of steam turbine is an important factor to influence the economy of the power plant.
汽轮机的热耗率是关系到发电厂运行经济性的重要因素。
The research results has provided an effective solution to the marine creature fouling in seawater once-through cooling system of gas-and-steam united circulating power plant.
研究结果为燃气蒸汽联合循环电厂直流冷却系统中的海生物污染控制提供了一种有效的解决方案。
In order to improve the thermal efficiency of power plant, the steam condition tends the more higher temperature and more higher pressure.
为了改善电站的热效率,蒸汽参数趋向于更高的温度与更高的压力。
We know that the superheated steam temperature of boiler superheated system in the fired power plant has nonlinear, uncertain, large time-delay and large inertial characteristics.
我们知道,火电厂锅炉高温过热器的过热汽温是一类非线性、时变大、大时滞、大惯性的典型对象。
Heat evolution correction method for node of the saturated steam network was put forward, which can be used for simulation for large-scale steam network of nuclear power plant.
针对单相可压缩流体网络模型提出了饱和蒸汽网络节点散热修正方法,可以用于核电站等大型蒸汽管网的仿真计算。
The key safety problem of a steam generation of PWR nuclear power plant is its instrumentation and control of water level, thus the reliability and safety is most important.
压水反应堆核电厂的蒸汽发生器的关键安全性问题就是其液位的仪表检测及控制问题,因此其可靠性与安全性就是极重要的因素。
The optimization is conducted for the general layout of gas and steam united circulating power plant of Han Steel according to technological requirement and present situation, and it meets the demand.
分析了在钢铁企业建设中总图布置的重要性,根据邯钢燃气蒸汽联合循环发电厂的工艺需要并结合邯钢现状,在发电厂的建设中进行了总图布置优化。
Steam generator is the main equipment in nuclear power plant and its stable water level is very important.
蒸汽发生器是核电厂动力装置中的主要设备,它的液位稳定具有非常重要的意义。
The performance of direct air-cooled steam condenser in power plant plays an important role in its safe and economical operation.
火电站直接空冷凝汽器性能决定了直接空冷机组能否安全高效运行。
Regarding the abnormal large vibration of reheat steam pipe of unit 3 for Shandong Huangdao Power Plant, the causes were analyzed.
针对山东黄岛发电厂3号机组再热管道出现的异常大幅度振动,进行了原因分析;
The system can be used not only in the control of circulation pumps in steam power plant but also in various water supplies pumping stations.
该系统不仅适用于火力发电厂循环水泵的控制,而且也可用于各类供水泵站的控制。
The system can be used not only in the control of circulation pumps in steam power plant but also in various water supplies pumping stations.
该系统不仅适用于火力发电厂循环水泵的控制,而且也可用于各类供水泵站的控制。
应用推荐