For parts of steel overcapacity worst-hit area, must under the big strength, strict control capacity blind development.
对于部分地区钢铁产能过剩严重的地区,一定要下大力量,严格控制产能的盲目发展。
Second, conduct strict quality control on materials needed for the rebuilding of the earthquake-stricken area.
二是严格对灾区恢复重建物资的质量把关。
Second, conduct strict quality control on materials needed for the rebuilding of the earthquake-stricken area.
二是严格对灾区恢复重建物资的质量把关。
应用推荐