This can result from location on an uneven surface, such as near and over a reef structure, or near a growth fault, or from different susceptibility to compaction.
这可以由沉积在不平坦的表面所引起,如邻近和覆于礁体构造之上,或靠近一生长断层,或缘于对压实作用不同的敏感性。
Steel-bonded cemented carbide powder processed by explosive compaction was successfully bonded to the surface of carbon steel through liquid phase sintering.
采用液相烧结法将爆炸压实后的钢结硬质合金粉末复合在碳钢表面,成功获得覆层材料。
This article mainly concentrated on the parameters transformation of vibrating compaction, hitting of roll compacted concrete, and surface vibration on the basis of experimental research.
通过试验研究,本文论述了碾压混凝土的振动碾压,击实和表面振动的参数变换关系。
The items of the quality testing were included the viscosity of recycling asphalt, asphalt content of reclaimed asphalt concrete materials, compaction, surface smoothness and placement temperature.
再生沥青混凝土质量检验项目包括再生沥青的黏度、刨除料含油量、压实度、路面平坦度与施工温度等。
Under continued loading the sliding surface is smoothed due to wear and compaction, which will result in a further decrease of the bond stress, similar to the case of plain bars.
在连续载荷下,因为磨损和压紧,该滑动面是光滑的,将导致粘结应力的进一步下降,类似于无节钢筋的情况。
Based on the collapsible loess subgrade in China northern region, this paper used dynamic sounding method and surface wave method to detect the impact compaction behavior.
基于中国北方某湿陷性黄土路基工程,利用动力触探和面波法等方法对冲击压实工后的黄土路基进行对比检测。
Each layer of loose paving thickness should be 30cm, paving the last degree should be uniform, the surface should be smooth after compaction.
每层的松铺厚度以30cm为宜,摊铺阼度应均匀,压实后的表面应平整。
The connection of the clamp is surface contact; and the clamp has large compaction force formed by bolts and high reliability, and is anti-corona.
本实用新型的连接为面接触,通过螺栓形成的压紧力大,防电晕,可靠性高。
Placement techniques is place the fibers or tape on the surface of tool in accordance with some regulations, through directly compaction pressure provided by compaction roller or shoe.
铺放就是通过使用压紧辊或压紧头按照一定规律把纤维束或纤维带直接压在模具表面上。
Steel-bonded cemented carbide powder mixture(TLMW50) processed by explosive compaction was successfully bonded to the surface of carbon steel through liquid phase sintering.
采用液相烧结技术成功地将爆炸压制后的钢结硬质合金混合粉末(对应国家牌号TLMW50)复合在碳素钢的表面。
The results showed that the compaction treatment measure conducted could be efficient to improve the moisture of the surface layer soil and improve the quality of the coal rejects reclaimed farmland.
结果表明,通过压实层处理措施可有效改善表层土壤水分,提高矸石复垦耕地质量。
The results show that the laser surface melting treatment improves greatly the homogenization, compaction and the corrosion resistance of rare earth permeating layer under the condition of test.
结果表明,在一定条件下,激光熔凝处理可进一步提高纯铁渗稀土层组织的致密性与均匀性,显著提高稀土渗层的耐蚀性。
WC steel-bonded cemented carbide powders being compacted by explosive compaction were bonded to the surface of carbon steel using liquid phase sintering.
采用液相烧结法将爆炸压实后的WC钢结硬质合金粉末复合在碳钢表面,对不同烧结温度下的界面组织和抗剪强度进行了研究。
The oscillating frequency and amplitude of screeding device of multifunctional paver influence the paving surface on smoothness and compaction greatly.
多功能摊铺机熨平工作装置的振捣频率和振幅对摊铺层的平整度和密实度的影响是非常大的。
Using the latter, with the correlativity of soil 'density and the velocity of the Rayleigh surface wave, we can obtain the compaction of the subgrade.
后者则是用已得到的各层瑞雷波速度值,利用土密度与瑞雷波速的相关关系计算各层的压实度。
Placement techniques is place the fibers or tape on the surface of tool in accordance with some regulations, through directly compaction pressure provided by compaction roller.
铺放就是通过使用压紧辊按照一定规律把纤维束直接压在芯模表面上。
Steel-bonded cemented carbide powders being compacted by explosive compaction were bonded to the surface of carbon steel using liquid phase sintering.
采用液相烧结技术成功地将爆炸压制后的钢结硬质合金粉末复合在碳素钢的表面。
Mainly used to compaction the asphalt surface and gravel, sandy soil.
主要用于压实沥青以及沙砾和砂土路面。
It also analyzes the grinding and compaction technology for the combination point between the road surface and special road section, as well as the key technology to improve...
具体分析了路面接荐处以及特殊路段的碾压工艺和提高热拌沥青混凝土路面压实质量的关键技术。
By analysing the monitoring data and adjusting the construction procedure in time, the relative displacement at contact surface of the wall footing caused by non uniform roller compaction of tran...
通过资料分析并及时调整施工程序,控制了因两侧过渡料碾压不均衡产生的墙底接触面错动。
By analysing the monitoring data and adjusting the construction procedure in time, the relative displacement at contact surface of the wall footing caused by non uniform roller compaction of tran...
通过资料分析并及时调整施工程序,控制了因两侧过渡料碾压不均衡产生的墙底接触面错动。
应用推荐