• One of the valid method to reduce the vertical breaking in deep-drawing of 18-8stainless steel is to adopt a die clearance which is less than the plate thickness.

    防止18 - 8型不锈钢技深件纵向开裂有效措施之一拉深采用小于板料厚度的凸凹模间隙

    youdao

  • The seepage field and stability of concrete-faced rockfill dam in Banduo Hydropower Project, when vertical joint inactivation are occurred to the face plate, are calculated by FEM method.

    班多面板堆石坝为例,用有限元方法计算了当面板局部失效各种工况下渗流场,系统分析了大坝面板垂直缝局部失效后的稳定渗流的规律特点。

    youdao

  • The seepage field and stability of concrete-faced rockfill dam in Banduo Hydropower Project, when vertical joint inactivation are occurred to the face plate, are calculated by FEM method.

    班多面板堆石坝为例,用有限元方法计算了当面板局部失效各种工况下渗流场,系统分析了大坝面板垂直缝局部失效后的稳定渗流的规律特点。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定