Suspended carriage for wind energy facility, rotary connecting device for wind egergy facility, wind egergy facility, driving method for wind egergy facility.
风能设施的吊厢,风能设施的旋转连接器,风能设施,风能设施的驱动方法。
Gamesa's Fairless Hills wind-energy turbine manufacturing facility employs approximately 300 workers and was built at a former U. S. Steel industrial site.
盖姆沙工厂的风能涡轮制造厂雇佣了大约300名工人,这家工厂的前身是一家钢铁工厂。
The layout of developing the large dimension wind tunnel, high Reynolds number wind tunnel, high-energy facility, will improve the simulative ability of wind tunnel and enhance the testing level.
规划中大尺寸风洞、高雷诺数风洞、高能量气动设备的研制,将使风洞模拟能力和测试水平实现新的飞跃。
The layout of developing the large dimension wind tunnel, high Reynolds number wind tunnel, high-energy facility, will improve the simulative ability of wind tunnel and enhance the testing level.
规划中大尺寸风洞、高雷诺数风洞、高能量气动设备的研制,将使风洞模拟能力和测试水平实现新的飞跃。
应用推荐