并对关键链项目管理方法与传统的项目管理方法,如关键路径法、计划评审技术的优势和劣势进行了比较。
Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
项目终期,提交项目终期报告,包括项目实施进展、以及至少2 个高效照明 节电技术最佳实践案例评审论证报告;
By the final-term of the project, complete the final report and the verification reports of at least 2 best case studies of high efficient lighting technologies;
基本的项目计划、关键路程、重要链子,和计划评审技术分析也许会减低失败的几率。
Basic project planning, critical path, critical chain, or PERT analysis may mitigate such failings.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
应用推荐