The three-dimensional finite element method was used to solve some key problems in the design of the box floor in Suzhou River Estuarine Lock project.
2
基于煤层顶、底板的整体插值,实现了对三维可视化矿床模型的断层处理。
Based on the continuing interpolation grid of the roof and floor of coal seam, a new resolution to fault is put forward on 3d visualization deposit modeling.
3
通过网络并行电法数据体的三维电阻率反演,得到矿井工作面底板下三维空间的电阻率分布特征。
With 3D-resistivity inversion technology of the net parallel electrical data, the resistivity distribution 3D mine face floor is got.