There always is water standing in depression of urban overpass or under-crossing tunnel, therefore it is very necessary to set up a monitoring system for road waterlogging.
After 15 years of construction work, the 9.5-meter (31-foot) wide drilling machine will bore through the remaining 1.5 meters of rock to join two ends of the tunnel some 2,000 meters under a mountain.
3
拟建的上海市轨道交通11号线区间盾构隧道近距离下穿交大海洋重点工程实验室群桩基础。
The interval shield tunnel of Urban transit line 11 in Shanghai is situated closely under the group piles of the National Key Laboratory for Ocean Engineering of Shanghai Jiaotong University.