Checking the joint accuracy and structure integrity between No. 8 and No. 9 block after closed. No.
2
对那些可见部分用于分段合拢的临时填充应整洁地将其去除,损坏的母材应通过焊接和打磨进行修复。
Where exposed to view, the temporary filling used for erection to be neatly removed, damages to the base material to be repaired by welding and grinding.
Traditionally, the integral casted stern post is positioned according to engine′s axes after completing subassembly on the berth. This technology is executed difficultly and needs large berth period.