Disk hub corrosion damages of a Beilun Power Plant's circulation pump were detected during the pump's overhaul.
2
对北仑电厂2号机组DAS系统主蒸汽流量指示值出现偏差的原因进行分析,找出原计算模块中存在的问题。
Causes of deviation of the main steam flow value indicated in DAS system for Beilun power plant unit 2 are analysed. The problems are found in the original calculation model.
3
分析了北仑发电厂600 M W 锅炉再热器局部超温及旁路改造未能达到预期效果的原因;
The causes for local overtemperature of high temperature reheater of 600 MW boiler in Beilun Power Plant and that bypass retrofit could not realize the expected effect are analyzed;