中英
后浇带计算
  • 翻译

After-cast strip calculation

以上为机器翻译结果,快速获取精准的人工翻译结果,建议选择有道人工翻译

  • 双语例句
  • 1
    温度应力计算时应考虑混凝土浇筑时间的不同、的设置对温度应力的影响。
    While calculating the thermal stress, the influence of concreting time and the arrangement of post-pouring belt on the thermal stress should be considered.
  • 2
    在数值计算的基础上,提出了的留置间距、封闭时间的理论值,并对后浇带的平面形状提出应注意的问题。
    The theory value of the spacing and the time sealing of the later joint-filled slots and some proposals on the plane form are presented on the basis of numerical calculation.
  • 3
    本文的研究成果可以用来指导的应用,也为计算的温度和应力提供了可借鉴的方法。
    The conclusions of this paper can guide the construction of the later joint-filled slots. On studying temperature and thermal stress of the later joint-filled slots, the new method is offered.
查看更多