The latter cast belt is usually set up in order to resist the contraction and uneven settlement of concrete in modern construction.
2
底板后浇带采用留置集水坑、设置临时防水板和采用快易收口网代替模板的技术措施;
Floor late poured bands apply the technical measures of indwelling catchpit, setting temporary waterproof board and adopting fast easy setback grid instead of formwork.
3
在钢筋混凝土结构中设置后浇带是目前常采用的一种方法。
It is a common practice to set embedded joint in the construction of mass concrete structure.