中英
后浇带设置要求
  • 翻译

Setting requirements for the post pouring belt

以上为机器翻译结果,快速获取精准的人工翻译结果,建议选择有道人工翻译

  • 双语例句
  • 1
    通常对长度较长、面积较大且地下室的高层板式楼宇等需按设计规范要求设置沉降或伸缩
    According to requirements of design codes, the post-cast concrete band is generally designed to tolerant the settlement and expansion of high-rise building with longer and large scale basement.
查看更多