The article analyses the mechanism and affected range of surface settlement around by excavation perviousness, and discusses the affecting factors and the measures to control it.
2
地面战士协作项目将内建一种设备,使陆军指挥快速访问作战行动中敌方及周边地区的关键信息。
The Ground Soldier Ensemble will feature built-in equipment that allows Army team leaders to quickly access critical information about each other and their surroundings during a mission.
3
利用GPS探测结果、探空资料和气象站常规地面观测资料反演了青藏高原及其周边地区的大气总水汽量。
And atmospheric water vapor distribution and change are studied synthetically based on GPS, radiosonde and other ground weather observations data over Tibet Plateau and around area.