Next station Xingong, interchange station for Line 4.
2
对广州地铁四号线地铁隧道进行了地震响应非线性有限元分析。
In this paper, dynamic finite element method was used to analyze the seismic response in No. 4 line of Guangzhou subway tunnel.
3
基于北京地铁四号线菜市口车站工程,介绍了钢管柱桩基的施工方案论证、技术措施和检测试验技术。
Based on Caishikou Station engineering of Beijing Metro Line 4, construction plan demonstration, technology measures and test technology about pile foundation of steel pipe column are introduced.