The general situation of the project of Huizhou Pumped Storage Power Station was introduced, and the mode of energy dissipation by hydraulic jump was suggested for upper reservoir overflow dam.
2
结合广州、惠州抽水蓄能电站对抽水蓄能电站通风空调设计中存在的问题进行了探讨。
The issues in design of ventilation and air conditioning for pumped storage power station are discussed in connection with the Guangzhou and Huizhou pumped storage power stations.